Since its founding in 1944, The Napp-Grecco Company has been dedicated to quality work at a competitive price.
HISTORY
Pipeline Construction
The Napp-Grecco
Company installed its first cross-country pipeline in 1955-the 55 mile
Trenton-Woodbury line. Since then, we've installed hundreds of miles of
large diameter transmission lines up to 42" in the most difficult urban
right-of-ways for various companies. We've established ourselves as the
New Jersey pipeline contractor who is uniquely equipped to handle your
next mainline project from a cross-country spread to a highway relocation.
When you want quality construction from clearing to clean-up, choose the
Napp-Grecco Company.
Utility Construction
In 1947, the Napp-Grecco Company pioneered the use of welded
steel pipe for gas distribution systems. Since then, we've
installed thousands of miles of gas mains and services for
several companies. And for more than forty years, we've
constructed underground electric systems, high voltage oil
static lines, and installed numerous manhole and conduit
systems. Our commitment to the utility industry is unmatched
by our competition.
Site Work Construction
In the 1930s, the company's founders were principally highway
and bridge builders. The Largest project completed then
is now known as Route 22. Today, we provide site work and
paving services to the industrial marketplace. We've cleared,
graded, curbed, piped, planted and paved diverse projects
from corporate headquarters to seaport cargo areas. Along
the way, we've completed park jogging trails, replanted
swamps to create wetlands and paved the U.S. 1&9 and
1-78 entrance roads into Newark Airport. Call us, we do
more than pipe work.
Petrochemical Construction
Since our first
liquid pipeline system in 1964, we have grown to offer complete refinery
and tank farm services from the tank nozzle through to the loading rack.
We've constructed major operating systems for several companies over the
years. Our services are diversified, from a ultra-clean oxygen system to
a state-of-the art compressed natural gas vehicle refueling system. In
1982, we expanded into Landfill Gas Recovery and have completed systems
for various clients from vertical wells to the thermal oxidizer.
Foundations and Structures
In 1947 Napp-Grecco
built the Stickle Bridge Helix in Newark, which is now Exit 15 on Route
I-280. Today, our capabilities are focused primarily on concrete foundations
and structures. Let us build your next petroleum tank foundation, electrical
substation or process plant foundations and structures, as well as construct your next pre-engineered building. Our
abilities are growing in this area and compliment our other services to
produce comprehensive, coordinated construction projects.
Construction Materials
Newark Asphalt Corporation was founded in 1965 to manufacture
bituminous asphalt paving materials. Now it's New Jersey's
premier manufacturer of quality asphalt from specialty bridge
deck mixes to shock absorbent asphalt for athletic facilities.
And when recycling was in its infancy, we erected our granulation
unit to reprocess old asphalt into new base mix. Our new
soils separation plant transforms bulk pavement and excavation
into road stone, pipe padding and top soil base stock. We
never apologize for the quality because we make it perfect
every time!